📐 Planning & Design

How long does house painting take in India?

🤖 AI Answer by Biddaro3 min read📅 Updated 1 November 2024
Quick Answer

Interior painting for a 2 BHK home takes 4–6 days; a 3 BHK takes 6–9 days. This includes wall putty (1–2 days drying), primer (1 day), and 2 coats of paint (2–3 days). Exterior painting adds 2–4 more days.

Painting Duration by Home Size

Home SizeInterior OnlyInterior + ExteriorPainters Needed
1 BHK (400 sqft)2–4 days4–7 days2–3 painters
2 BHK (700 sqft)4–6 days7–10 days3–4 painters
3 BHK (1,000 sqft)6–9 days10–14 days4–5 painters
4 BHK (1,400 sqft)8–12 days14–18 days5–6 painters
💡
Drying Time

Do not rush. Putty needs 24 hrs drying, primer needs 4 hrs, each paint coat needs 4–6 hrs before next coat. Rushing causes peeling within 6–12 months. Avoid painting in heavy rain or humidity above 85%.