Yas Island, Abu Dhabi

Top Drywall Contractors in Yas Island

Fast, clean, and versatile — gypsum drywall is ideal for office partitions, false ceilings, and feature walls. Expert drywall contractors on Biddaro in Yas Island deliver smooth, ready-to-paint finishes quickly with fire-rated and moisture-resistant options. Serving all areas of Yas Island and surrounding Abu Dhabi regions.

Background Verified Local Contractors Transparent Pricing

100+

Drywall Contractors in Yas Island

4.8★

Avg. Rating

< 4 hrs

First Bid Time

AED 20–60 / sq ft

Avg. Rate

Verified Drywall Contractors in Yas Island

All contractors are verified, reviewed, and ready to bid on your project.

A
Verified

Al Jazeera Construction

Yas Island, Abu Dhabi
4.9(87)156 jobs
Partition WallsView Profile
E
Verified

Emirates Build Masters

Yas Island, Abu Dhabi
4.7(52)93 jobs
False CeilingView Profile
G
Verified

Gulf Pro Services

Yas Island, Abu Dhabi
4.6(34)61 jobs
Gypsum BoardingView Profile
D

Dar Construction

Yas Island, Abu Dhabi
4.5(28)44 jobs
Acoustic PanelsView Profile
N
Verified

Nakheel Contractors

Yas Island, Abu Dhabi
4.8(71)118 jobs
Fire-Rated PartitionsView Profile
R

RAK Builders

Yas Island, Abu Dhabi
4.4(19)32 jobs
Partition WallsView Profile

Drywall Services in Yas Island

Partition Walls
False Ceiling
Gypsum Boarding
Acoustic Panels
Fire-Rated Partitions
Finishing & Taping

Check Drywall Costs in Yas Island

Get detailed cost breakdowns before hiring a contractor.

View Cost Guides

FAQs

How much does drywall partitioning cost in Yas Island?

Drywall partition installation in Yas Island typically costs AED 20–45 per sq ft for standard gypsum board. Fire-rated or acoustic-grade boards cost AED 35–60 per sq ft. Civil defence requirements may mandate fire-rated boards in commercial spaces.

Is drywall suitable for bathrooms and kitchens in Yas Island?

Moisture-resistant (green board) gypsum board is recommended for bathrooms and kitchens. Given Yas Island's air-conditioned interiors, condensation is less of an issue, but green board is still best practice for wet areas.

How fast can drywall work be completed in Yas Island?

A typical office partition project of 500 sq ft in Yas Island can be completed in 2–4 days. False ceiling installation for a 3-bedroom apartment takes approximately 3–5 days.

Does drywall meet UAE fire safety requirements?

Yes, when specified correctly. Fire-rated gypsum boards (Type X) meet UAE civil defence requirements for commercial interiors. Your contractor on Biddaro will recommend the correct specification based on your building's fire safety classification.

Hire a Drywall Contractor in Yas Island Today

Post free. Receive bids. Pay safely via escrow. No hidden fees.

Get Started Free