Home/ERP/FAQ/How to Track Construction Materials and Prevent Site Wastage?

Construction ERP FAQ

How to Track Construction Materials and Prevent Site Wastage?

Material wastage is one of the biggest hidden costs in construction. Industry estimates suggest that 5–15% of all materials purchased on a construction site are wasted due to over-ordering, theft, damage from improper storage, or incorrect installation.

Common causes of material waste:

  • No visibility into what was ordered vs what arrived vs what was used
  • Ordering in bulk to "be safe" rather than tracking actual consumption
  • Materials going missing without any audit trail
  • Subcontractors using more than their allocated quantity
  • Tracking materials with Biddaro Site Manager:

    1. Add materials — Create entries for each material type: cement, steel, bricks, sand, electrical fittings, plumbing materials, etc.

    2. Log transactions — Record every purchase (ordered), delivery (received), and usage (consumed) with quantity and date

    3. Status tracking — Each material batch moves through Pending → Ordered → Delivered → Installed

    4. Cost tracking — Enter unit rates and Biddaro calculates material cost totals automatically

    5. Inventory visibility — The dashboard shows current stock levels so you can reorder at the right time — not too early, not too late

    6. Transaction history — Full audit trail of who recorded what and when

    With Biddaro, site managers can check material status from their phone at any time, and project owners get a dashboard view of total material costs vs budget.